Product Categories

Contact Us

Address: Road No.5,The Industrial District Of Longshan,Zhangqiu city,Shandong China
Tel.:+86-531-83628999
Phone1:+86-13220595111
Phone2:+86-18888316111
Phone3:+86-15588833931
WhatsApp:+86-15624587040
WeChat1:+86-13220595111
WeChat2:+86-15624587040
E-mail:zhe@zeyucrane.com
E-mail:jin@zeyucrane.com

Description

SC series of lifts use the most advanced technology at home and abroad, with features such as reasonable structure, simple operation, and safe and reliable work. Meanwhile, they adopt famous electrical components and the main transmission parts at home and abroad, and are welded of the high-quality steel while protected by the CO, gas.

SC series construction hoist for the qear, rack and pinion drive, using advanced technology at home and abroad, after years of self- digestion, innovation, novel design, reasonable structure, convenient operation, assembly and disassembly conveniently. fine appearance, work safely and reliably.

Standard specifcations tower body mast section of 650x650x1508, 800x800x1508, there are various varieties in the form of structure such as SCD double-drive, with counterweight, SC three-drive without counterweight, built-in, overhead type and frequency conversion control.The device is applicable to more than 60m of bridges, chimneys, buildings and other high-rise building construction personnel and materials transprt, but also can be used as warehouses and wharfs, etc. as the vertical transportation.

Company's newly developed micro-controlled automatic leveling device, floor wireless pagers, voice alarm overload(to choose from). The device is fully functional, three kinds of functions can be used alone, or you can freely mix and match with a Pc motherboard as a whole, to achieve automation.

SC200/200/SCD200/200 construction hoist parameters:

Main parameter

Unit

Type

Main parameter

Unit

Type

Load capacity

Kg

2000x2

Cage dimensions

m

3x1.3x2.3
3x1.5x2.45

Basic high

m

50

Section dimensions

mm

650x650x1508
800x800x1508

Lifting speed

m/min

34.4

Safety breaker type

 

SAJ4.0x1.2

Maximum lifting height

m

150

Operate pressure

v

~380±50Hz

Person capacity

Several

20x2

Motot power

Kw

11x3/15x2

 

Honor

Manufacturing license
Business license
Quality Management System Certification
Special equipment production license

Corporate Environment

Shot blast derusting
Manipulator welding
Elcetrical assembly
CNC machining center

Factory appearance

Factory appearance
Factory appearance
Factory appearance

Transport packaging

Transport packaging
Transport packaging
Transport packaging

Customer visit

Customer visit
Customer visit
Customer visit

FAQ

...

Q

Bolts are loose and not tightened


A

Preventive measures: After the tower crane is installed, the bolts of each link must be tightened again and tightened regularly during use, with an interval of no more than one week. A new tower crane must be tightened no more than once every three days in the first two months of use.

Q

Verticality out of tolerance


A

Preventive measures: When burying the tower crane foundation base, carefully perform leveling, especially after the concrete is poured, the leveling must be checked again. During use, after anchoring and jacking, the verticality must be checked in time. If a problem is found, find out the cause in time and put it back in place.

Q

Open welding, cracks, deformation, twisting, etc. of the frame


A

Preventive measures: Before entering the site, carefully check whether there are any defects in the standard section, big arm, balance arm and other parts. If you want to paint, you must check before painting.

Q

Water accumulation on foundation


A

Preventive measures: Set up a water accumulation pit and use a sewage pump to pump out the accumulated water.

Get a free quote

Please fill in the contact information with your needs, we will arrange a professional to contact you!

  • How many products do you need?
  • What other information do you need to know?
Submit