Product Categories
Contact Us
Address: Road No.5,The Industrial District Of Longshan,Zhangqiu city,Shandong China
Tel.:+86-531-83628999
Phone1:+86-13220595111
Phone2:+86-18888316111
Phone3:+86-15588833931
WhatsApp:+86-15624587040
WeChat1:+86-13220595111
WeChat2:+86-15624587040
E-mail:zhe@zeyucrane.com
E-mail:jin@zeyucrane.com
QTZ63(5013) Topkit tower crane
Keywords:
Description
Topkit tower crane is used for high-rise civil architecture, bridge and water conservancy projects, long span industrial factory buildings,etc.
Loading capacity
Jib length(m) |
|
16 |
19 |
23 |
27 |
29 |
32 |
35 |
38 |
40 |
42 |
44 |
46 |
48 |
49 |
50 |
3t-27.795 |
|
3 |
3 |
3 |
3 | 2.844 | 2.507 | 2.228 | 1.993 | 1.856 | 1.732 | 1.169 | 1.516 | 1.422 | 1.378 | 1.335 |
6t-15.742 |
|
5.881 | 4.818 | 3.833 | 3.140 | 2.865 | 2.516 | 2.228 | 1.985 | 1.844 | 1.715 | 1.599 | 1.492 | 1.395 | 1.349 | 1.305 |
Mechanism specification
Hoisting |
|
|
KW |
|
m/min |
80.5/40.6/8.7 |
40.3/20.3/4.35 |
24/24/5.4 |
|
T |
1.2/3/3 |
2.4/6/6 |
||
Trolleying |
|
m/min |
43.4/21.7 |
3.3/2.2 |
Slewing |
|
r/min |
0.68 |
3.7x2 |
Climbing |
|
m/min |
0.4 |
5.5 |
Necessary electric power |
40.2 |
|||
Main supply |
~380V/50Hz |
|||
Jib length(m) |
50 |
|||
Counterbalance(t) |
11 |
Honor




Corporate Environment




Factory appearance



Transport packaging



Customer visit



FAQ
...

Bolts are loose and not tightened

Preventive measures: After the tower crane is installed, the bolts of each link must be tightened again and tightened regularly during use, with an interval of no more than one week. A new tower crane must be tightened no more than once every three days in the first two months of use.

Verticality out of tolerance

Preventive measures: When burying the tower crane foundation base, carefully perform leveling, especially after the concrete is poured, the leveling must be checked again. During use, after anchoring and jacking, the verticality must be checked in time. If a problem is found, find out the cause in time and put it back in place.

Open welding, cracks, deformation, twisting, etc. of the frame

Preventive measures: Before entering the site, carefully check whether there are any defects in the standard section, big arm, balance arm and other parts. If you want to paint, you must check before painting.

Water accumulation on foundation

Preventive measures: Set up a water accumulation pit and use a sewage pump to pump out the accumulated water.
Get a free quote
Please fill in the contact information with your needs, we will arrange a professional to contact you!